Quality
Located on
- P1
This is the line of bolts just above "Chimney Fire" and right of "Captain Hook." It can be accessed by either doing "CF" or "DtRR" and lowering down to the belay of "CF." 4 bolts (DBB) -This line requires a hammer and a spanner to set and tighten the bolts still. Also, it appears that the nut on the bottom bolt fell off as well, so a 10mm SS nut is required to tighten down the hanger.
Comments
UUID
7c693ee7-2a05-4b2c-b2b7-9df832936581