Skip to main content

Pump Action

Grade
25
4
Quality
1.02
Located on

  • P1
  • 25
  • 4

Just to the right. Dynamic moves to leave the ground before moving rightward under the first roof. Move up to the top of the groove and step right. From this subsidiary corner head up and left to finishing holds and an abseil ring. Four bolts. Tony Burnell, 2000.


Comments
UUID
 
fa946d5a-ae50-4849-a4da-a523ededdfb6